|
Project |
Size |
Construction
Value ($) |
Scope
of Work |
|
Design and construction of Well
Head Workshop |
2800
m2 |
1.6 million |
Mechanical,
Electrical,
Fire alarm system, Fire fighting system design
Engineering Consultancy |
|
Design and
construction of Chemical warehouse |
3600 m2 |
4.8 million |
Mechanical design
Electrical design
Fire alarm system
Fire fighting system
Construction Supervision |
|
Mud warehouses |
5600 + 2800
m2 |
3 million |
Preliminary steel structure
Foundation design
Electrical design
Fire alarm
Fire fighting |
|
Bulk Warehouse |
1800
m2 |
1.4 million |
Preliminary steel structure
Foundation design
Electrical design
Fire alarm system design
Fire fighting Design
Site Supervision |
|
Pipe Inspection Workshop |
1000
m2 |
1.8 million |
Preliminary steel structure
Foundation design
Electrical design
Fire alarm
Fire fighting
Heating Design
Pressurized air pipe design |
|
Rigging and lifting Workshop |
500 m2 |
1.5 million |
Preliminary steel structure
Foundation design
Electrical design
Fire alarm
Fire fighting
Heating Design
Equipment foundation design
Site supervision |
|
1500 man canteen kitchen extension |
900 m2 |
1.2 million |
Steel building design
Mechanical Design
Electrical Design
Fire Alarm system |
|
Outside infrastructure works
-
Design of 4000 meter fire water ring main including pump house
and pump design
-
Design of open area lighting of 500.000 m2 Drilling Base
-
Design of sewer system of Drilling Base and lifting station for
400 permanent employees
-
Design of gas line to heat up above buildings
|